Tooling developed
Click on any tool to see the full page with an interactive 3D model, technical description and field photos.
3D ✓
Generator Lifting Beam 53 t
Lifting beam for hoisting and handling the generator. It spreads the load across two points, ensuring balanced, safe lifting.
3D ✓
Nacelle Lifting Beam 80 t
Hydraulic lifting beam for hoisting and levelling a complete nacelle. Three cylinders fine-tune the position to align all the connecting bolts during assembly.
3D ✓
Main Shaft Bearing Housing, 11 t
Steel frame for supporting the main shaft of a gearbox. WLL 11 t.
3D ✓
Main Shaft Frame 30 t
Frame for supporting the main shaft in an oblique position. The bearings are anchored diagonally, adapting to the specific geometry of the assembly.
3D ✓
Alternator Transport Cart 10 t
Steel trolley for the safe transport and handling of the alternator assembly in hydroelectric plants. Structure adapted to the component, with controlled movement.
3D ✓
High-Speed Shaft Transport Trolley 300 kg
Steel trolley for the safe transport and handling of the wind turbine high-speed shaft. Structure adapted to the component, with controlled movement.
3D ✓
Hub Support Brackets 140 kg
Set of 3 steps that bolt around the front opening of the hub, following its circumference, and act as access steps to the top. With a non-slip base.
3D ✓
Hexagonal Nacelle Support Table 145 t
Hexagonal support table that receives the rest of the nacelle once separated from the yaw system. Stable support for the assembly during maintenance operations.
3D ✓
Nacelle Support Table 145 t
Support table for lowering and holding the complete nacelle on the ground during maintenance. It anchors the yaw system and allows the rest of the nacelle to be separated, leaving the yaw resting on it.
3D ✓
Hub Lifting Lugs 2×38 t
Set of 2 lugs that bolt onto the existing bearing bolts to lift the complete hub. Positioned diametrically opposite, each rated at 38 t.
3D ✓
Hoist Hook Guard 800 kg
Steel guard for the hoist hook, made of two folded plates that wrap around the joint between hook and chain. It protects the area and prevents accidental disconnection.
3D ✓
Cable Clamp 1 t
Steel gantry with a central shackle for holding cables, with an independent anchor plate. Firm fixing and safe handling.
3D ✓
High-Speed Shaft Bearing Extractor 12 t
Extractor for the controlled removal of the high-speed shaft bearing. Light and easy to handle, it applies the extraction force without damaging adjacent components.
3D ✓
Main Shaft Installation Tool 11 t
Tool for holding the main shaft by one end during installation into position. Enables controlled fitting of the shaft in the wind turbine.
3D ✓
Pitch Cylinder Removal and Lifting Tools 400 kg
Set of tools for the extraction and lifting of the wind turbine pitch cylinder. Clamps distributed along the cylinder and elements at each end that create multiple pulling and lifting points.
3D ✓
Hub Heavy Components Beam 400 kg
Two-section bolted lifting beam installed on the front of the wind turbine hub. It serves as a hoist anchor point for moving and lifting heavy components during maintenance.
